United Kingdom
| Installation year: | 2006 |
| Project developer: | Talisman Energy/REpower |
| Wind turbine type: | REpower 5 MW |
| Foundation: | Jacket structure |
| Scope of work: | Design verification of support structure Manufacturing survey of primary support structure Design verification of turbine tower and integrated loads |
